ادارة مشاريع المعلومات

بواسطة ابراهيم الشهري

0
موثوق
ميزانية المشروع

SAR 40

تفاصيل المشروع

‏Assignment 2 Student Name Student ID Section Total 10   ‏➢ This assignment is due on Saturday, April 10 , 2021.   ‏➢ No late assignment is accepted. ‏➢ Please name your word\PDF file like this Student Serial#_SectionNumber e.g. (1_KJ). ‏Question 1: (total mark 1.50 points) ‏The following table shows different tasks in risk, the scenario of this table is as the following:   ‏      IKEA company was trying to get some furniture from its warehouse, the truck has broken down, the weather was too bad for other trucks as well to drive on the road. Thus, the furniture would get delayed. ‏a. Which of the following task do you think has the most impact on the project? (0.50 point) ‏b. Calculate the risk score from the following risk impact table. (0.50 points) ‏c. Determine the ranking\priority of each task. (0.50 points) Risk Register Task ID Description Probability Impact 1 IKEA truck breaks down 7% 9 2 Weather makes road impassable 8% 9 3 Truck drivers call in sick 3% 7   ‏a: …………………………………………………………………………… ‏b: Risk Register Task ID Description Probability Impact 1 IKEA truck breaks down 7% 9 2 Weather makes road impassable 8% 9 3 Truck drivers call in sick 3% 7   ‏c: Risk Register Task ID Description Risk Score 1 IKEA truck breaks down .63 2 Weather makes road impassable .72 3 Truck drivers call in sick .21     ‏ Question 2: (total mark 8.5 points) The following table shows different project performance metrics, the Plane Value (PV) to complete this project is 500,000.00 Earned Value and its use in Cost Control. Work Package BCWS ACWP %Progress BCWP Planned Value Actual Cost Earned Value 1 $100,000.00 $120,000.00 100% 2 $100,000.00 $110,000.00 100% 3 $100,000.00 $80,000.00 90% 4 $100,000.00 $125,000.00 80% 5 $100,000.00 $75,000.00 50% 6 $100,000.00 $0.00 0% 7 $100,000.00 $0.00 0% 8 $100,000.00 $0.00 0% 9 $100,000.00 $0.00 0% 10 $100,000.00 $0.00 0% BAC   a. Calculate the Earned Value for each work package shown in the table. (5 points) b. Calculate the Earned Value for the entire project. (0.25 point) c. Calculate the Budget at Completion (BAC) for the entire project. (0.25 point d. Calculate the Actual Cost for the entire project. (0.25 point) e. Use your answer from point b and d to calculate the Cost Variance of this project. (0.50 point) f. Use your answer from point b and d to calculate the Cost Performance Index of this project. (1 point) g. Calculate the schedule Variance for this project. (0.25 point) h. Calculate the schedule Performance Index for this project. (0.50 point) i. From your previous answers, do you think this project would finish on time and within the budget? (0.50 point) e Cost Variance (CV = -----------) f Cost Performance Index (CPI = ----------) g Schedule Variance (SV = ----------) h Schedule Performance Index (SPI = ---------)

التصنيف

الكتابة و الترجمة

المهارات المطلوبة

استشارة
المستقلين مقدمين العروض لهذا المشروع

لايوجد عرض سعر

تاريخ نشر المشروع: 11/04/2021 19:09 PM

معدل العروض بالريال: ---